|
Removal and installation
Prevention
Works are carried out together.
| PERFORMANCE ORDER |
| 1. Open a cowl and close rags wings and an air inlet lattice. |
|
2. Disconnect hoses of a stekloomyvatel. |
|
3. Outline contours of loops of a cowl. |
|
4. Enclose rags under cowl corners, ask the assistant to hold a cowl on the one hand, unscrew bolts of loops and remove a cowl. |
| 5. Installation is carried out upside-down. |
|
Adjustment
After installation it is necessary to adjust the provision of a latch so that the cowl was densely closed, and the surface of a cowl was aflush with wings.
| PERFORMANCE ORDER |
| 1. Outline bolts of a latch of a clamp of a cowl. |
| 2. Release bolts and move a clamp to the necessary situation then bolts tighten. |
|
3. Turning out or turning, adjust cowl buffers on a radiator rack so that the closed cowl was aflush with wings. |
| 4. And a loop of a cowl it is necessary to grease a latch periodically the litoly. |
|
|